commit | e8441d7c95fef7feb94a25376fd8c86dfaae31f3 | [log] [tgz] |
---|---|---|
author | Ghanshyam Mann <gmann@ghanshyammann.com> | Fri Dec 20 11:43:27 2024 -0800 |
committer | Gregory Thiemonge <gthiemon@redhat.com> | Thu Jan 09 11:24:39 2025 +0100 |
tree | 5ce35b248848b0b5865feda0dcce841768a8caa6 | |
parent | 035e8b12d48e6b600b43dd65a66d8092041d97fb [diff] |
Update gate jobs as per the 2025.1 cycle testing runtime As per 2025.1 testing runtime[1], we need to test on Ubuntu Noble (which will be taken care by depends-on tempest and devstack patches to move base jobs to Noble) and at least single job to run on Ubutnu Jammy (for smooth upgrade from previous releases). This commit keep a scenario job to run on Jammy which can be removed in the next cycle. Depends-On: https://review.opendev.org/c/openstack/tempest/+/932156 [1] https://governance.openstack.org/tc/reference/runtimes/2025.1.html Change-Id: I8219106ec26ddc2edfaf39a69c64a9887fdfb54c