Spliting centos scenario job into 2 jobs

The duration of the c9s scenario job is really close to the max timeout
in Zuul, spliting it into 2 jobs would reduce the duration of the tests
and would avoid possible timeouts.

Change-Id: I3b70171624e5c42fd6055d73a040704af5910944
2 files changed